Laying of bitumen surfaces

Křetín

III/36511 KŘETÍN – LAZINOV

 
Project description:
  • The subject of the contract was the full-area reinforcement of the original structural layers along the entire length of the III/3651 road.
  • The project spanned an area of 14.227 m2
  • A new wearing course of very thin asphalt concrete modified BBTM 8S in the thickness of 35 mm was laid.