Laying of bitumen surfaces
Křetín
III/36511 KŘETÍN – LAZINOV
Project description:
- The subject of the contract was the full-area reinforcement of the original structural layers along the entire length of the III/3651 road.
- The project spanned an area of 14.227 m2
- A new wearing course of very thin asphalt concrete modified BBTM 8S in the thickness of 35 mm was laid.