Waterproofing of traffic and civil engineering structures

HOHENAU

BRIDGE RECONSTRUCTION AT KM 80.930 OF THE HOHENAU (ÖBB) – PŘEROV

Investor/Contracting Authority: Czech Railway Administration
 
Project description:
Application of sprayed insulation on the steel structure of a bridge using the Masterseal M800 waterproof insulation system. The total area of sprayed insulation is 1 238 m2 in a nominal thickness of 5 mm.